Skip to content

IFS ERP HR and Time and Attendance Integration

Field and project teams are planned in IFS; their hours and payroll close in HR&Tomorrow.

Projects, work orders and cost centers in IFS are read into HR&Tomorrow. Time and attendance records and shifts from the field feed timesheets, timesheets feed payroll, and labour cost returns to IFS with the same project breakdown.

Products we often see: IFS Cloud, IFS Applications 10, IFS Applications 9

Two-way data flow
IFS

Cost centers, organisation

Accruals, expenses, advances

HR&Tomorrow
Who it’s for: Companies that use IFS for projects, maintenance or field service, with teams working on construction sites, at facilities or at customer sites
Division of work

Who does what between IFS and HR&Tomorrow?

The two systems never do the same job twice. Each record is created in one place and flows to the other from there.

Stays in IFS

  • Project, work order and maintenance planning
  • General ledger and cost tracking
  • Purchasing, inventory and asset management
  • Field service appointments

Runs in HR&Tomorrow

  • Employee records, personnel files and organisation
  • Time and attendance, shifts and overtime timesheets
  • Leave, sick notes and absence records
  • Turkish payroll and SGK (Turkish social security) filings
A month of data

How does the IFS integration work over a month?

Which data goes in which direction, in order, from setup to after payment.

  1. At setup
    IFS → HR&Tomorrow

    Projects and work orders become visible

    Active projects, work orders and cost centers are read from IFS. Where the field team works is matched against this list.

  2. Every day
    HR&Tomorrow → IFS

    Site check-ins are recorded

    Employees check in at the site or facility by QR code, card or mobile location. The record goes into timesheets and, where needed, onto the related job in IFS.

  3. During the month
    IFS → HR&Tomorrow

    Planned work informs the shift plan

    Maintenance or project workload planned in IFS helps shift planners see which team needs to be where.

  4. At month-end
    HR&Tomorrow → IFS

    Labour cost goes back to the project

    When payroll closes, cost is split according to the project and work order distribution in the timesheets and transferred to IFS.

  5. At close
    HR&Tomorrow → IFS

    The accrual lands in the general ledger

    The payroll accrual journal entry is sent to the IFS general ledger, broken down by account and cost center.

Data map

Which record flows which way?

RecordDirectionWhat is carried
Project and work orderIFS → HR&TomorrowWhere the field team works
Cost centerIFS → HR&TomorrowEmployee cost assignment
Check-ins and working hoursHR&Tomorrow → IFSBy project and work order
Labour costHR&Tomorrow → IFSProject distribution after payroll
Payroll accrual journal entryHR&Tomorrow → IFSBy account and cost center
Employee master dataHR&Tomorrow → IFSEmployee number, skills and team details
Setup

How is the IFS connection set up?

  1. Step 01

    Discovery call

    In a 30-minute call we talk through your ERP product, version and company structure, and how payroll gets into accounting today.

  2. Step 02

    Code mapping

    The chart of accounts, cost centers and pay items are mapped between the two systems. The connection method — API, web service or file transfer — is confirmed at this stage.

    Codes mapped
    • Company and site
    • Project and work order numbers
    • Cost centers
    • Account codes
  3. Step 03

    Connection

    The ERP connection is set up on day one of the transition. Cost centers and organisation codes are read, and employee records are opened with the right cost assignment.

  4. Step 04

    First accrual

    At the first payroll close, the entry is produced as a draft, checked together with your accounting team and sent to the ERP once approved.

In practice

Typical setups at companies using IFS

  • Energy and infrastructure

    Teams spread across construction sites

    Teams rotate between several sites. Working hours go to the project at whichever site the check-in was made; at month-end, labour cost is visible project by project in IFS.

  • Maintenance and service

    Technicians at customer sites

    Technicians spend the day at different customer sites. Hours and overtime are tracked on mobile, payroll closes under local legislation, and cost goes back to the work order.

FAQ

Frequently asked questions about the IFS integration

Let’s talk through your IFS setup in 30 minutes

Tell us your ERP product and version and how payroll gets into accounting today; we’ll work out together how the mapping will be set up.

Your cookie preferences

We use optional cookies to understand how the site is used and to measure our advertising. Unless you allow them, only essential cookies run. Cookie Policy